Queenstown Airport Check In Expansion, Queenstown, New Zealand
- project management of the fast-track design and construction of an expansion to the check-in area of the terminal. 5 check-in counters were added bringing the total to 21. The project was designed and constructed over a 5 month period and completed on time and under budget.
|
|
| |
|
Queenstown Airport Rescue Fire Appliance Refurbishment, Christchurch, New Zealand
- supervision of the refurbishment of 20 year old rescue fire appliance in a Christchurch engineering workshop. |
|
| |
|
Queenstown Airport Security Fence Upgrade, Queenstown, New Zealand
- project management of the re-construction of the full 4 kms security fence around the airport ($0.4million) |
|
| |
|
Queenstown Airport Rescue Fire Appliance Procurement, Queenstown, New Zealand
- procurement management for two rescue fire appliances for the airport, including preparation of documentation, tendering, evaluation and reporting. (NZ$1.5million)
|
|
| |
|
Queenstown Airport Ongoing Capital Works and Development Planning, Queenstown, New Zealand
– retained by the airport company to advise and manage their capital works planning and implementation including projects such as; terminal reconstruction, noise management, relocation of light aircraft and helicopter operations and general land development.
|
|
| |
|
Wanaka Airport Development, Ongoing Services, Wanaka, New Zealand
- representation at planning hearings, preparation of submissions for district plan variations and resource consents including designations, air-noise boundaries, building restrictions and aeronautical planning, and assistance with tenant and airline negotiations. |
|
| |
|
Invercargill Airport Car Parking Equipment,
Invercargill, New Zealand
- review of revenue collection system upgrade options for the
airport carpark and subsequent specification, tendering and
procurement assistance for a fully automated car park management
and revenue collection system. |
|
| |
|
Invercargill Airport Baggage Reclaim Carousel,
Invercargill, New Zealand
- planning, specification, tendering and contract administration
for a new baggage reclaim unit. |
|
| |
|
Hong Kong Airport Standard Specifications,
Hong Kong
- benchmarking, review and updating of a suite of standard specifications
for use on all future construction projects at Hong Kong airport,
including management of a multinational team of consultants. |
|
| |
|
Queenstown Airport Terminal Re-development,
Queenstown, New Zealand
- project facilitation, planning, and ongoing management support
to the owner for a fast-track re-development of the combined
international and domestic terminal (NZ$6.0million). |
|
| |
|
Tradeport Logistics Centre, Hong Kong Airport,
Hong Kong
- independent construction review on behalf of the lending
banks for a logistics centre at Hong Kong Airport with a floor
area
of 32,000 m2 (US$50million). |
|
| |
|
Wanaka Airport Master Plan, Wanaka, New Zealand
- master planning to meet the rapidly developing needs of the
community, tourism operators, scheduled airlines and the Wanaka
Warbirds airshow and museum. |
|
| |
|
Budget Rent a Car Service Centre, Queenstown
Airport, New Zealand
- project facilitation and management for a design-build, lease-back
development by the Queenstown Airport Corporation. |
|
| |
|
Queenstown Airport Carpark Development,
Queenstown, New Zealand
- master planning, tendering, negotiations and supervision for
the re-development of the airports parking including a fully
automated revenue collection system. |
|
| |
|
Queenstown Airport Runway Re-surfacing,
Queenstown, New Zealand
- project review and advice to the Board on a NZ$3 million fast-track
re-surfacing of the airport's runway whilst maintaining full
operational capability. |
|
| |
|
Permanent Aviation Fuel Facility, Hong Kong
- contract review and tendering advice to a team bidding for
the franchised construction and operation of a new fuel terminal
and sub-sea pipeline servicing Hong Kong's international airport. |
|
| |
|
AFSC Aviation Fuel Facility, Hong Kong
- project review of design and construction on behalf of the
Lenders to this US$250 million facility including offloading
jetty, subsea pipeline, 120,000 m3 tank farm and apron hydrant
system. |
|
|
"Driving the Planning and Development of Regional
Airports in New Zealand."
|